A Senceive Case Study
Dakota County faced a challenge while performing essential improvements to the 100-year-old Lake Byllesby Dam, a high-hazard structure. The project required demolition and reconstruction of the powerhouse, and they needed to ensure the dam's stability throughout construction. A traditional wired monitoring system was infeasible due to inaccessible locations and a lack of power, so they turned to vendor Senceive for a solution.
Senceive implemented a wireless monitoring solution using their Triaxial Tilt Sensors and FlatMesh platform, with data relayed via a solar-powered gateway to their WebMonitor software. This provided near real-time, 24/7 data, quickly detecting any irregular movement and providing peace of mind to engineers and ownership. The solution successfully satisfied regulatory concerns and proved the structure's stability, with plans to use the sensors for long-term monitoring after construction.