AECOM required a structural monitoring solution to ensure safety during track lowering and drainage works within the historic Chipping Sodbury Tunnel. The challenge was to implement a system that could operate reliably over 4km in a wet, dusty environment with significant vibration, all without interfering with construction. AECOM chose Senceive's wireless FlatMesh Nano triaxial tilt sensor nodes and Optical Displacement Sensors for this critical task.
The solution implemented by Senceive involved deploying over 200 Nano tilt sensors on the tunnel lining, supplemented by Optical Displacement Sensors and High-G Triaxial Tilt Sensor nodes on the track. This wireless system provided continuous data transfer and automated alerts, successfully monitoring for movements without disrupting the tight construction schedule. The Senceive technology proved highly reliable, allowing AECOM to verify the structural assessment's findings and ensure the project was completed safely.