Senceive
83 Case Studies
A Senceive Case Study
Acciona faced significant challenges while constructing the São Paulo Metro Line 6, a major underground project in a dense urban environment. The need to tunnel beneath high-rise buildings, operational metro lines, and a viaduct in variable geological conditions required continuous, high-frequency structural monitoring, which was impossible with traditional manual methods due to restricted access. To address this, Acciona partnered with Senceive to implement an automated wireless monitoring solution.
Senceive provided a system of wireless triaxial tilt and optical displacement sensors that communicated via a mesh network to gateways, transmitting data to their WebMonitor platform. This solution delivered 24 times more data readings daily than manual methods, enabling real-time alerts and early detection of movement. The results included a 66% cost saving, over 5.5 million additional automated readings, and the successful protection of critical infrastructure with no exceedance of movement thresholds, all while reducing the project's environmental impact.