SEAM Group
17 Case Studies
A SEAM Group Case Study
An American multinational technology company required assistance in maintaining its commitment to worker safety at a major new distribution facility. They needed to minimize high safety risks and costly unplanned downtime, which cost an estimated $100k per hour. To meet these objectives, the company partnered with SEAM Group for low voltage preventative maintenance (LVPM) and Arc Flash mitigation services.
SEAM Group implemented a comprehensive solution including LVPM and the design and installation of an Arc Flash relay system. During the work, their experts also resolved an unexpected issue with a critical switch, safely restoring power. The results were significant, with Arc Flash incident energy levels reduced from 100-200cal to 3-8cal. This allowed for preventative maintenance without full facility shutdowns, creating a far safer and more reliable operational environment for the customer.
American Multinational Technology Company