SCIA
32 Case Studies
A SCIA Case Study
Witteveen+Bos, an engineering consultancy, faced the challenge of designing the complex, double-curved Verlengde Waalbrug, a 275-meter post-tensioned concrete bridge with a hybrid foundation. To solve this, they utilized SCIA Engineer within a BIM environment to model the intricate geometry and analyze the structure's behavior.
SCIA Engineer enabled the creation of a detailed 3D model with 3,200 shell elements, which was used to optimize the bridge's dimensions and foundation interaction. The solution from SCIA provided powerful analysis and transparent reporting, leading to a verifiable calculation and a significant reduction in the required reinforcement. This streamlined the design process and shortened the production path.