A SCIA Case Study
Intertechne, a Brazilian engineering consultancy, faced the challenge of meeting tight deadlines for the expansion of the Galeão International Airport complex in preparation for the 2016 Olympic Games. The project involved a complex phased structure with prefabricated elements and required managing numerous architectural changes. To address this, Intertechne utilized SCIA's software solutions, including SCIA Engineer and Allplan.
The implementation of SCIA's tools was fundamental to the project's success. The use of Allplan enabled effective generation of layouts, which brought about a 100% increase in productivity and optimized the team's work. SCIA's solutions allowed for customized representation of prefabricated elements, guaranteed standardization, and facilitated planning for assembly. This raised the standard of production to a new level of competitiveness and quality, ensuring a high-quality result was achieved on time.