SCIA
32 Case Studies
A SCIA Case Study
The customer, Allcons Industry S.r.o, faced the complex challenge of replacing a massive blast furnace and its surrounding steel structures for the ISDEMIR steel plant in Türkiye. The 7500-ton structure had to be designed under a strict six-month deadline, requiring parallel work and modeling of intricate vehicle movements on the casting platform. They utilized SCIA Engineer from vendor SCIA to address this.
SCIA's solution enabled the engineering team to divide the project into separate static models for parallel work, later combining them for comprehensive analysis. Key features like the "Train load" function accurately modeled vehicle movements, and global seismic analysis was performed. This use of SCIA Engineer allowed Allcons to successfully complete the design and validation on schedule, contributing to the realization of the new blast furnace and supporting the plant's ongoing operations.