Pend Oreille Public Utility District (PUD) faced the costly and complex challenge of replacing its nearly 20-year-old remote terminal units (RTUs) across six substations. The electric utility's initial options involved an expensive module upgrade that added complexity or a complete rewiring of the system. Schweitzer Engineering Laboratories (SEL) presented an innovative third option to modernize the infrastructure.
The solution from Schweitzer Engineering Laboratories utilized an SEL Real-Time Automation Controller (RTAC) paired with SEL-2240 Axion modular I/O and custom cabling. This approach retained all existing field wiring, creating a plug-and-play upgrade that provided greater system visibility and improved reliability. The measurable result was a project cost that was less than half the price of the original module upgrade plan, resulting in tremendous savings for the utility.
Mike Boyle
Pend Oreille Public Utility District (PUD)