Case Study: Empire District Electric Company restores power after an EF5 tornado with SEL protective relays

A Schweitzer Engineering Laboratories (SEL) Case Study

Preview of the Empire District Electric Company Case Study

Empire District Electric Company restores power to 12,000 customers in 10 days with SEL

Empire District Electric Company faced a catastrophic challenge when an EF5 tornado completely destroyed a substation in Joplin, Missouri, leaving 20,000 customers without power. Amid the devastation, an SEL-501 Dual Universal Overcurrent Relay from Schweitzer Engineering Laboratories (SEL) was discovered still standing and operational on a demolished breaker.

SEL expedited the delivery of new relays and provided equipment at a considerable discount, helping Empire restore power to 12,000 customers within ten days and completely rebuild the substation in seven months. The original SEL-501 relay was later retested and found to be in perfect working order, a testament to SEL's product durability. Empire was honored with an industry award for its restoration efforts.


View this case study…

Schweitzer Engineering Laboratories (SEL)

117 Case Studies