Schneider Electric
129 Case Studies
A Schneider Electric Case Study
Interxion France faced the challenge of keeping pace with a rapidly evolving colocation market that demands greater connectivity, redundancy, power and environmental compliance. For the last 15 years Interxion France has partnered with Schneider Electric, using solutions such as EcoStruxure IT for Data Centers, Galaxy and Symmetra UPS systems, chillers/HDCV units and turnkey prefabricated data‑center kits to design, build and operate flexible, high‑density facilities.
Schneider Electric supported Interxion France across design, installation and operations — for example, Paris 7 uses Schneider chillers and HDCV with free‑cooling plus four redundant Symmetra PX 1.4 MW UPS chains and EcoStruxure monitoring for real‑time infrastructure control, while the MRS2 Marseille site was delivered as a prefabricated containerized data center with 2x Galaxy 5500 UPS and StruxureWare in just two months. The result: faster deployments (70 m² buildout in two months), expanded reach into emerging markets in Africa and the Middle East, improved availability and energy efficiency, and large‑scale capacity such as Paris 7’s ~9,000 m² of computer rooms — all enabled by Schneider Electric.
Fabrice Coquio
President