Case Study: Granado Pharmácias achieves improved product quality, traceability and up to 15% production increase with Schneider Electric's EcoStruxure Plant (with AVEVA)

A Schneider Electric Case Study

Preview of the Granado Pharmácias Case Study

How EcoStruxureTM Plant with AVEVA helps Brazil’s oldest cosmetics company digitize its traditional manufacturing process

Granado Pharmácias, Brazil’s oldest cosmetics company, faced quality inconsistencies, limited traceability and manual operations across its 30,000 m² Japeri plant that threatened its international expansion. To modernize production and ensure repeatability, Granado Pharmácias engaged Schneider Electric to drive a digital transformation using EcoStruxure Plant and related automation solutions.

Schneider Electric implemented an integrated automation platform—including EcoStruxure Hybrid DCS with AVEVA Batch Management and AVEVA Historian—to unify control, capture real‑time and historical data, and standardize recipes and reporting. The upgrade improved traceability and reduced downtime, boosting product quality and delivering a measured 10%–15% increase in production while positioning Granado Pharmácias for Industry 4.0.


Open case study document...

Granado Pharmácias

Tatiane Stoeterau

Industrial Production Manager


Schneider Electric

129 Case Studies