Schneider Electric
129 Case Studies
A Schneider Electric Case Study
Veolia Water was contracted to build a state-of-the-art wastewater treatment plant at Punta Gradelle on the Sorrento coast to protect residents and the environment after existing disposal practices and non-compliant facilities threatened the coastline. Facing strict regulatory and sustainability goals — including reuse of recovered materials and the need for reliable, tunnel-based operations — Veolia Water sought an advanced supervision and control system and partnered with Schneider Electric, leveraging EcoStruxure for Water & Wastewater and EcoStruxure Hybrid DCS.
Schneider Electric implemented a holistic EcoStruxure solution — including Hybrid DCS, Plant Operations & Energy Management, MV & LV power meters, Altivar drives and iPMCC panels — to centralize real-time data, enable edge control and support predictive maintenance. The deployment delivered measurable impact: up to 15% annual energy savings, a 20% improvement in production efficiency, reduced downtime and faster response times, and improved overall service reliability.
Gianfranco Favali
Project Design Department Manager