Case Study: OMV improves Primavera P6 schedule health audits with ScheduleReader

A ScheduleReader Case Study

Preview of the OMV Case Study

OMV speeds schedule health audits with ScheduleReader’s one-button DCMA 14-point assessment

OMV, an oil and gas company, needed a quick way to audit the health and integrity of Primavera P6 project schedules without performing a time-consuming detailed review. Their planning consultant sought a solution from ScheduleReader to rapidly assess schedules under tight time constraints.

ScheduleReader provided an instant solution with its DCMA 14-point assessment dashboard. With a single button, OMV could determine if a schedule was worth a deeper review, resulting in significant time savings and a quicker turnover of feedback. The ScheduleReader tool prevented them from wasting time on schedules that were not ready for detailed analysis.