Case Study: Habersham Electric Membership Corporation boosts grid resilience and cuts outage time with S&C Electric Company

A S&C Electric Company Case Study

Preview of the Habersham Case Study

Habersham reduces outage duration by 14.6% with S&C Electric Company

Habersham Electric Membership Corporation, a cooperative utility in Georgia, faced reliability challenges due to its mountainous and heavily forested terrain, leading to frequent outages from animals and falling trees. To improve resilience and reduce downtime for its 28,000+ members, HEMC launched a grid modernization plan and partnered with S&C Electric Company, utilizing their IntelliRupter fault interrupters and TripSaver II reclosers.

The S&C solution automated HEMC's feeders and lateral lines, using PulseClosing technology to isolate faults and restore power rapidly. This integration with the utility's SCADA system provided real-time visibility. As a result, HEMC achieved a 14.6% average reduction in outage duration and a 38% decrease in minutes without power, alongside improved SAIDI, SAIFI, and CAIDI metrics. S&C Electric Company's technology was instrumental in these gains, supporting HEMC's continued modernization efforts.


View this case study…

S&C Electric Company

7 Case Studies