Case Study: St Helier Hospital achieves improved power resilience and DCIM visibility with Salute Mission Critical

A Salute Mission Critical Case Study

Preview of the St Helier Hospital Case Study

St Helier Hospital upgrades critical power in 6 weeks with Salute Mission Critical

St Helier Hospital required an upgrade to its data center's power and infrastructure to support its critical IT services, including those for its 24-hour accident and emergency department. The challenge was to replace the outdated UPS and improve the environment without causing any disruption to the live, mission-critical hospital systems. Salute Mission Critical was commissioned to plan and manage this sensitive project.

Salute Mission Critical designed and installed a new modular UPS system and implemented a DCIM software solution, completing the project within six weeks with zero downtime. The new infrastructure provided N+1 resilience and scalability, while the DCIM tool offered full visibility of assets for improved monitoring and capacity planning. This solution from Salute Mission Critical ensured the hospital's critical environment remained resilient and fit for future needs.


View this case study…

Salute Mission Critical

15 Case Studies