RoviSys
37 Case Studies
A RoviSys Case Study
RoviSys partnered with general contractor Walbridge to deliver building automation for a large-scale electric vehicle battery manufacturing campus in Tennessee. The challenge involved integrating a wide array of building systems, manufacturing processes, and third-party utilities across a vast site, requiring a unified controls architecture to manage significant complexity and ensure efficient operation from day one.
The solution implemented by RoviSys was a unified building automation platform using the Tridium Niagara framework, integrating equipment from multiple vendors. This scalable system successfully unified building automation, power monitoring, and critical process systems like dehumidification units, meeting stringent production requirements. The project advanced faster than comparable sites, and the successful collaboration has led Walbridge to request the same RoviSys team for future initiatives, with ongoing support and enhancements continuing at the facility.