Abbott Northwestern Hospital faced a critical challenge with its aging 1950s-era boiler system, which caused unstable power, brownouts, and outages that threatened patient safety and hospital operations. The hospital needed a modern, reliable energy system compliant with strict NFPA 99 standards and partnered with RoviSys for a solution.
RoviSys implemented integrated Normal Power and Essential Power Control Systems using Rockwell Automation and Woodward technology. This solution ensured uninterrupted power, met rigorous NFPA 99 testing requirements, and was delivered on schedule and within budget. RoviSys successfully modernized the hospital's infrastructure, resulting in high customer satisfaction and an ongoing partnership for future expansions.