RISA Technologies
18 Case Studies
A RISA Technologies Case Study
The Naval Facilities Engineering Command required a structural engineering solution for a large, clear-span helicopter hangar and training complex at Camp Pendleton. The main challenge was designing a massive 320-foot span steel truss to support two bridge cranes while meeting a strict deflection limit for their proper operation. RISA Technologies' product, RISA-3D, was used to tackle this design challenge.
RISA Technologies' solution involved using RISA-3D to model, analyze, and design the entire hangar structure. The software's integration with BIM models allowed for an iterative design process that strengthened the trusses to achieve the necessary L/600 crane deflection limit, ultimately minimizing the overall steel tonnage. The result was the successful completion of the 131,000 sq. ft. LEED Gold-certified complex that provides unobstructed space for maintaining up to nine helicopters.