A K-12 school engaged Rimkus for a third-party building enclosure design review for a second building in its growing Houston-area campus portfolio. The challenge was to identify potential gaps in the water, air, and thermal barrier systems within the construction documents before building began, thereby preventing future performance issues, costly repairs, and ensuring the long-term health of the building's occupants.
Rimkus implemented a targeted review of the design drawings and specifications, applying the same rigorous methodology used on the client's previous project. The solution identified numerous issues, including unspecified drainage slopes, gaps in air barrier continuity, and missing quality assurance protocols, all of which were corrected before construction started. As a result, Rimkus delivered significant value by ensuring portfolio-level consistency, embedding quality assurance into the construction process, and protecting the building's performance for decades at a minimal pre-construction cost.
K-12 School