Case Study: a K-12 school in Texas protects its new campus with Rimkus third-party building enclosure design review

A Rimkus Case Study

K-12 School catches 100% of enclosure issues before construction with Rimkus

A K-12 school in San Antonio, Texas, required an independent, third-party review of its building enclosure design before construction began. The challenge was to identify any gaps in the water, air, and thermal barrier systems within the construction documents to ensure the long-term health, comfort, and safety of the school's future occupants and to prevent costly future repairs.

Rimkus performed this targeted design review, which identified critical omissions and provided actionable recommendations. The solution ensured the design met industry best practices, embedded quality assurance protocols into the construction process, and prevented potential failures. By catching these issues pre-construction, Rimkus delivered significant time and cost savings for the project while ensuring the building would perform as intended for decades.


View this case study…

Rimkus

34 Case Studies