Case Study: a major hotel and convention center complex addresses construction cost overruns and schedule delays with Rimkus

A Rimkus Case Study

a major hotel and convention center complex addresses a 2.5 million-square-foot construction delay with Rimkus

The customer, a major hotel and convention center complex, faced significant construction cost overruns and schedule delays following the failure of a critical structural steel tension rod. Rimkus was retained to determine the extent of the structural damage and to analyze the associated financial and scheduling impacts.

Rimkus conducted a detailed on-site inspection and analysis of the deficiencies and proposed repairs. The vendor assessed the extent of the damage, evaluated the construction delays both before and after the failure, and analyzed the related cost overruns. Through its investigation, Rimkus provided a comprehensive evaluation of the incident for the client.