Case Study: BMO Field Stadium achieves LEED Gold-ready air quality and energy efficiency with RenewAire ERV technology

A RenewAire Case Study

BMO Field Stadium secures LEED Gold-ready air quality with RenewAire HE10RT ERV

BMO Field Stadium in Toronto faced challenges in preparing its luxury suites for the 2026 World Cup. The venue needed to manage extreme crowd densities that led to poor indoor air quality while also balancing the need for fresh air with strict energy limits to meet LEED Gold and FIFA sustainability goals. RenewAire, through its representative Kilmer Environmental, provided the solution with its HE10RT energy recovery ventilator (ERV).

The RenewAire HE10RT ERV was installed to continuously introduce fresh outdoor air while recovering energy to minimize heating and cooling loads. This solution allowed the stadium suites to maintain pristine air quality during high-capacity events and provided a critical pathway for the venue to achieve its targeted LEED Gold certification. By choosing RenewAire's innovative ventilation, BMO Field optimized its energy performance and ensured a healthier, more sustainable environment for occupants.


View this case study…

RenewAire

11 Case Studies