Case Study: Dura Vermeer achieves streamlined interface management and compliance on the Zevenaar Integrated Railway with Relatics

A Relatics Case Study

Preview of the Dura Vermeer Case Study

Relatics enables Dura Vermeer and Movares to deliver the complex project ‘Zevenaar Integrated Railway’

Relatics supported Dura Vermeer (main contractor) and Movares (design coordinator) in delivering the Zevenaar Integrated Railway, a multidisciplinary upgrade to enable more and faster trains. The project involved complex technical interfaces—an innovative voltage lock, ERTMS conversion, new safety systems and cross-border coordination with Deutsche Bahn—plus hundreds of subcontractors, strict contract requirements and large volumes of designs, changes and verification evidence to manage.

Using Relatics’ cloud platform as a single source of truth, the teams centralized interface and requirements management, tracked design changes and handled verification/validation digitally, including audits by external parties. The result was better control and “first-time-right” quality, fewer mistakes, real-time access to correct information, faster and more predictable deliverables (and payments), reduced failure costs and stronger compliance—helping both firms digitize and future-proof their processes.


Open case study document...

Dura Vermeer

Joost Poot

Process Manager


Relatics

45 Case Studies