Case Study: Cintas achieves $21.8M in operational cost savings with Redaptive Energy-as-a-Service

A Redaptive Case Study

Preview of the Cintas Case Study

Redaptive Energy-as-a-Service Program Reduces Operational Costs By $21.8M For Cintas

Cintas sought to significantly reduce electricity consumption across its rental and supply chain facilities but lacked the internal program management bandwidth to undertake a large-scale lighting retrofit themselves. They partnered with Redaptive to address this challenge.

Redaptive implemented an end-to-end Energy-as-a-Service program, managing a lighting and solar solution with minimal disruption. This included upgrading 46,000 lighting fixtures and installing a 422.4 kW solar system. The results were improved lighting, a safer workplace, and a projected $21.8 million in gross energy savings over 10 years, alongside a major reduction in carbon emissions.


View this case study…

Redaptive

15 Case Studies