A multi-hospital academic health system eliminates ~$1M in annual cooling rental costs with Redaptive

A multi-hospital academic health system faced a critical challenge when the central cooling plant at its flagship hospital reached the end of its service life. The degradation forced the hospital to spend approximately $1 million annually on temporary cooling rentals, risking operational resilience without a permanent solution. A capital-intensive upgrade was difficult to prioritize against clinical needs and required approval from a large, diverse buying group. The health system turned to Redaptive to modernize this essential infrastructure without diverting capital from patient care.

Redaptive addressed this by financing the project through an Energy-as-a-Service model, requiring zero upfront capital from the customer. They managed the entire process, from the initial audit and vendor selection to the ongoing installation of a new, resilient chiller plant. The solution by Redaptive eliminated the yearly $1 million rental expense, installed permanent infrastructure with N+1 redundancy, and was completed without impacting clinical operations or the health system's credit rating.


View this case study…

Redaptive

36 Case Studies