Case Study: Darigold cuts lift-truck maintenance costs 50% with The Raymond Corporation's iTRACK system

A The Raymond Corporation Case Study

Preview of the DariGold Case Study

Darigold Streamlines Maintenance with iTRACK by Raymond

DariGold, a Seattle-based dairy cooperative with 13 plants and two distribution sites, needed to centralize maintenance cost tracking, standardize its lift truck fleet for varied environments (washdown, cold storage) and reduce inefficient local leasing. To address these challenges, DariGold engaged Raymond Handling Concepts Corporation (RHCC) and The Raymond Corporation, adopting the web-based iTRACK lift truck tracking and reporting system.

RHCC and The Raymond Corporation implemented the iTRACK system to provide fleet-wide, web-accessible maintenance and productivity reporting. Within six months DariGold cut lift truck maintenance costs in half, reduced leasing expenses, decreased downtime, and improved productivity while maintaining uptime, thanks to better visibility and planned maintenance enabled by The Raymond Corporation’s solution.


Open case study document...

DariGold

Mike Bevers

Supply Chain Purchasing, Director


The Raymond Corporation

20 Case Studies