Case Study: Sanofi reduces changeover time by 57% with Raven

A Raven Case Study

Preview of the Sanofi Case Study

How Sanofi Reduced Changeover Time by 57% on Key Packaging Lines

Sanofi, a world-leading pharmaceutical company, faced challenges in digitizing its operational performance management. Their existing processes were time-consuming and failed to engage plant teams, forcing a reliance on pen-and-paper tracking that prevented a complete understanding of production inefficiencies. They needed a digital solution from a vendor like Raven to capture real-time data, analyze root causes of losses, and empower frontline workers.

Raven implemented its OEE improvement software, featuring Smart Assistants for downtime tracking and a stepwise changeover program. This provided Sanofi with real-time reporting and alerts, automating data collection and creating full visibility into production time. As a result, Sanofi reduced changeover time by 57% on key lines, increased capacity by 25%, and achieved $230k in cost savings, alongside significant operational improvements like reducing shifts and overtime.


Open case study document...

Raven

12 Case Studies