Elsewedy Electric, an Egypt-based global infrastructure provider, faced a challenge where its engineering team had to juggle multiple separate tools for solar project layout design and energy yield assessment. This fragmented process was slow and inefficient, often taking weeks to develop a single engineering package. The company turned to RatedPower for a solution.
By implementing RatedPower's integrated platform, Elsewedy Electric consolidated its design and energy yield work into a single tool. This allowed engineers to run multiple design iterations simultaneously to find optimal solutions faster and identify potential issues early. As a result, RatedPower helped the customer reduce its engineering package development time from weeks down to just days or hours, dramatically increasing efficiency.