Case Study: Ready-mix Concrete Producer achieves real-time fleet optimization and on-time, lower-cost deliveries with Ramco Systems

A Ramco Systems Case Study

Preview of the Concrete Producing Company Case Study

Ready-mix concrete producer finds a ready-made solution with Ramco!

A multinational ready-mix concrete producer operating across the Middle East, North Africa and India — producing 10 million m3 annually with a 600-vehicle fleet and over 10,000 daily trips — needed a system to make scheduling the core of its operations. Despite heavy investment in equipment and R&D and a leadership position in sustainability, the company struggled to improve fleet utilization, guarantee on-time deliveries at minimum total cost, and track and reschedule thousands of daily trips across multiple countries.

Ramco’s cloud-based Dynamic Scheduling and Real-time Tracking provided a finite-state engine for GPS/telemetry, GIS mapping and geo-fencing, and a scheduling engine that consolidates orders and auto-replans in real time. The solution delivered live dashboards, vehicle control and rescheduling, and end-to-end visualization from batching to on-site pumping, enabling better resource sharing between command centers, reduced costs, consistent on-time delivery, improved customer satisfaction, and real-time monitoring of mix and delivery conditions.


Open case study document...

Ramco Systems

115 Case Studies