Case Study: JVA Electrical achieves 30% fuel savings and improved productivity with RAM Tracking

A RAM Tracking Case Study

Preview of the JVA Electrical Case Study

J.V.A Electrical Saved 30% A Month On Fuel

JVA Electrical, a Kent-based electrical contractor with a 25-vehicle fleet, needed to cut rising costs and gain better control over its reactive field operations. To solve this, the company turned to RAM Tracking and deployed RAM’s vehicle tracking system to monitor real-time locations and manage fleet activity.

RAM Tracking installed trackers across JVA Electrical’s fleet, delivering automated timesheets, real-time vehicle visibility and tighter control over private use. The result was a measurable impact — up to 30% monthly fuel savings — plus improved punctuality, higher engineer productivity and more efficient job allocation thanks to RAM Tracking’s system.


Open case study document...

JVA Electrical

Craig Albert

Director


RAM Tracking

13 Case Studies