Case Study: JW Danforth achieves on-time delivery and real-time field-to-office collaboration with Raken

A Raken Case Study

Preview of the JW Danforth Case Study

JW Danforth - Customer Case Study

JW Danforth (John W. Danforth) faced a fast-moving, complex job at the College of Nanoscale Science and Engineering where they were awarded a project with only 60% IFC drawings and a tight deadline. Working as General Foreman Nigel Domer describes, the team needed to share 3D laser‑scanned field data quickly with CAD and fabrication shops and coordinate changes in real time to avoid costly delays.

Raken provided the field technology and real‑time collaboration tools that let JW Danforth capture and share accurate site data, log and analyze issues remotely, and coordinate redesigns and safety or schedule changes instantly. Using Raken, the team delivered the project on time and exceeded client expectations, shortened timetables versus previous projects, improved bill‑of‑material accuracy, and reduced cost overruns through better data and faster decision‑making.


Open case study document...

JW Danforth

Todd Follis

Director of Construction Operations


Raken

50 Case Studies