Radware
100 Case Studies
A Radware Case Study
SK C&C, a Seongnam, South Korea–based IT services firm, consolidated web portal services for its 14 subsidiaries into a single high-density data center to reduce costs and simplify operations. The project required multiple server farms capable of 10Gbps throughput per farm and an active/backup ADC design to handle growing web traffic while improving manageability and compliance.
Radware’s Alteon 5412 was deployed—fourteen units in active-backup ADC pairs—providing four 10GE ports for higher density, flexible redundant topology and a familiar CLI; a lab PoC validated the design. The solution delivered the needed capacity and high availability, lowered operational expenditures by refreshing the ADC line, and extended platform support (5‑year guarantee plus 3 years of support), reducing TCO and accelerating ROI.