Quickbase
122 Case Studies
A Quickbase Case Study
Sturgeon Electric California, a MYR Group Inc. subsidiary and leader in power-line, commercial, and industrial electrical construction, launched a high‑voltage contracting branch for Southern California Edison and needed a faster, more flexible way to manage field projects. Relying on spreadsheets and paper created bottlenecks as work scaled and requirements changed, and the company wanted to minimize time spent on administrative “paper pushing” by field crews.
They adopted Quick Base to build a no‑code, role‑based project management app with dashboards, alerts, a central document repository, and partner add‑ons for streamlined field uploads. The platform gave instant visibility across jobs, sped mobilization and collaboration, and shortened the invoice cycle from 41 to 26 days—helping Sturgeon fast‑track roughly 4,488 projects since 2015 and better meet evolving customer needs.
Jesse Guardado
Project Manager