Case Study: JBT saves over $160K and 2 months of vehicle production time with Quickbase

A Quickbase Case Study

Preview of the JBT Case Study

How JBT Saved Over $160K and 2 Months of Vehicle Production Time in a Single Year with Quickbase

JBT needed a better way to track time, efficiency, and production bottlenecks because its ERP system wasn’t configured to handle those tasks well. The company turned to Quickbase, a low-code platform, to bring projects, timelines, resources, and progress updates into one place and improve manufacturing visibility.

With Quickbase, JBT centralized operations, automated manual tracking, and built a custom vehicle production app with a Kanban board for status updates and time logging. The results were significant: JBT saved over $160K and reduced vehicle production time by 2 months in a single year, including 5 hours saved per vehicle since August 2023.


View this case study…