A QTS Realty Trust Case Study
A global semiconductor manufacturer running a high-performance grid in a flagship southeast data center operates two 1 MW data halls with extremely dense racks (up to 30 kW/rack). They needed to keep power utilization under an 80% threshold but lacked rack-level visibility from weekly reports, which led to costly precautionary power purchases, difficulty identifying oversubscribed racks, and a risk of deployment delays due to cabling and layout constraints.
By deploying QTS Service Delivery Platform’s Power Analytics the customer gained real-time, rack-level power metrics, 3D floor layouts, mobile access and proactive alerts at the 80% threshold. This enabled remote rebalancing and precise provisioning to avoid interruptions, eliminated unnecessary power buys, supported on-time equipment deployments, improved forecasting, and now drives daily engineering decisions that optimize utilization and lower costs.
Global Chip Manufacturing Company