Case Study: Livi Steel saves 4,943 bolts with Qnect

A Qnect Case Study

Preview of the Livi Steel Case Study

Livi Steel - Customer Case Study

The customer, Livi Steel, partnered with the vendor Qnect to optimize the structural steel connections for the new Berkshire High School in Burton, Ohio. The challenge was to improve efficiency and reduce material waste on the 712-ton project, which included 1,259 beam assemblies.

Qnect implemented its solution to optimize bolt placement. This resulted in the dramatic elimination of 4,943 bolts. The specific impacts included 1,811 fewer holes needing to be punched or drilled and 431 copes being eliminated, leading to significant time and material savings


View this case study…

Livi Steel

Don Livi

Livi Steel


Qnect

16 Case Studies