Case Study: IQHQ cuts nearly $500K in steel costs with Qnect

A Qnect Case Study

Preview of the IQHQ Case Study

IQHQ - Customer Case Study

The customer, IQHQ, faced the challenge of developing a carbon-neutral building at their 109 Brookline Avenue project while seeking to control costs and material usage. They engaged the vendor, Qnect, for connection engineering, detailing, and optimization services to address these goals.

By implementing their services, Qnect enabled a fabricator to lower its bid by nearly $500,000 through the creation of a connected model. This solution directly reduced the amount of steel required, facilitated exact material ordering, and minimized change orders. For IQHQ, the significant reduction in material was instrumental in supporting the project's aim to become one of Boston's first entirely carbon-neutral buildings.


View this case study…