Case Study: AECOM Tishman accelerates JFK Terminal 6 delivery with Qnect

A Qnect Case Study

Preview of the AECOM Tishman Case Study

AECOM Tishman - Customer Case Study

The project's general contractor, AECOM Tishman, benefited from the use of Qnect's software and its Early Connected Model approach on the structural engineering and fabrication of the new JFK Terminal 6. This large-scale airport modernization required a highly efficient workflow from design to fabrication to meet its ambitious timeline.

By implementing Qnect's solution, the project team achieved a fully connected model early in the process. This allowed for the early detection of design issues, improved coordination with other trades, and a significantly accelerated timeline. The use of Qnect resulted in the optimization of connections, saving thousands of field bolts and eliminating the need for costly steel doublers.