Českomoravský Cement, a.s, the largest cement producer in the Czech Republic, faced challenges with an outdated conveyor system at its Radotín plant. The existing system had an inadequate feed rate, poor stability, and frequent material blockages. The customer needed a sustainable solution that would increase efficiency, reduce energy consumption, and lower maintenance. They partnered with vendor Qlar to address these issues.
Qlar supplied Českomoravský Cement with a MoveMaster C chain conveyor as part of a full turn-key system. This solution successfully achieved the required feed rate of 15 t/h, eliminated blockages, and provided high stability. Most significantly, the new system from Qlar uses only 62% of the nominal current, a stark improvement over the old system's 90%, resulting in substantially reduced energy consumption and supporting the customer's sustainability goals.