Case Study: LS Industrial Systems achieves 20% product development productivity gains with PTC Windchill

A PTC Case Study

Preview of the LS Industrial Systems Case Study

LS Industrial Systems Improves Product Development Productivity by 20% with PTC Windchill Solution

LS Industrial Systems faced fragmented, manual product-development processes: CAD data lived in desktop silos, design reuse was rare, duplicate work was common, intellectual property was lost when engineers left, and BOMs had to be manually rekeyed into ERP. To address these challenges, LS Industrial Systems engaged PTC and its PLM/CAD stack—notably PTC Windchill PDMLink, PTC Creo, and PTC Creo View—to modernize data management and collaboration.

PTC implemented Windchill PDMLink 8.0 alongside PTC Creo and Creo View to create a single, secure online product-data backbone, enable modular design and reuse, enforce role-based access, and provide real-time workflows for global teams and suppliers. As a result, LS Industrial Systems increased product development productivity by 20%, accelerated new-model development through design reuse, reduced duplicate work and lead times, and better protected its intellectual property.


Open case study document...

LS Industrial Systems

Jong-Ho Song

Manager


PTC

101 Case Studies