PTC
101 Case Studies
A PTC Case Study
JinTECH, a global leader in tire manufacturing equipment and drum and curing presses, faced pressure to reduce errors, lower product costs driven by expensive materials, and speed time to market. To address these challenges, JinTECH worked with PTC and adopted PTC Creo as part of its CAD and product development strategy.
PTC implemented PTC Creo to accelerate model creation and support rapid prototyping, enabling faster fixture design and fewer design errors. As a result, JinTECH cut lead time for modeling fixturing by 6–10%, reduced time to market by 9%, and lowered its error rate by 13% after moving from Pro/ENGINEER Wildfire 5.0 to PTC Creo.
Jung-Won
General Manager, Research Dep