Proven Energy, a fast-growing wind turbine manufacturer based in Stewarton, Ayrshire, needed a way to improve the accuracy and build quality of its 6kW down-wind turbines while reducing assembly time and labour costs. To support the automated winding of the generator core, the company turned to Protolabs for a precision plastic bobbin used as an accurate spacer on the core.
Protolabs reviewed Proven Energy’s design, suggested material and design modifications, and worked through a few revision rounds efficiently and quickly. The result was a high-accuracy moulded part that helped improve product quality and significantly cut assembly time; with 18 bobbins per machine, production is expected to reach around 10,000 units per year for the 6kW model, with further growth as the part is extended across the range.
Jonathan Nowill