ProSymmetry
22 Case Studies
A ProSymmetry Case Study
Embraco, a multinational manufacturer of refrigeration solutions, faced the challenge of gaining a holistic view of its globally dispersed project teams and improving its resource management capabilities. Their existing on-premises Microsoft Project setup was costly and lacked the necessary visibility and flexibility for their multi-location operations. Seeking a cloud-based solution, they turned to ProSymmetry and its product, Tempus Resource.
ProSymmetry implemented Tempus Resource to integrate with Embraco’s existing Microsoft Project environment. This provided a cloud-based, user-friendly platform that connected disparate teams and delivered granular visibility into resource allocation. The solution enabled Embraco to identify over and under-utilization of resources, saving the company significant time and money while providing the PMO with greater confidence and control over its project pipeline.
Talita Wajczyk
Senior PMO Analyst