A ProLion Case Study
Klinikum Peine, a municipal hospital, faced the challenge of modernizing its IT infrastructure with a redundant datacenter despite having no suitable space on-site, as upgrading its facility would have been too costly and time-consuming. Their objective, driven by the Hospital Future Act, was to ensure high data availability and robust IT security, leading them to engage ProLion.
CANCOM implemented a solution featuring a NetApp All-Flash MetroCluster for high availability and deployed ProLion's CryptoSpike ransomware protection. This combination ensured uninterrupted, secure data operation from a flexible datacenter-in-container setup and proactively defends against cyberattacks with real-time monitoring. The result is a highly available, secure, and scalable infrastructure that reliably protects patient data and prepares the hospital for future growth.