Warsteiner Brauerei Haus Cramer KG - Customer Case Study

Warsteiner Brauerei Haus Cramer KG, a German brewery, required a highly flexible production data acquisition (PDA) system for its new bottling plant to improve operational transparency, product quality, and decision-making. The challenge was to integrate data from numerous sources, including machine controllers and inspection systems, to manage a large number of articles and enable efficient production planning. To meet this need, they partnered with vendor ProLeiT.

ProLeiT implemented a comprehensive PDA system that featured decentralized article switching and fault assignment via touch panels, ensuring reliable data acquisition from both PLC and PC-based controllers using their Plant Connect iT software. The solution provided technical reporting via MS Excel and integrated with production planning for real-time order tracking. This allowed Warsteiner to achieve precise documentation of material usage and wastage. The results included optimized plant performance and a significant reduction in running-in time for new facilities, leading to lower personnel costs. Based on this success, Warsteiner plans to equip its other plants with the identical ProLeiT system.


Open case study document...

ProLeiT

48 Case Studies