The customer, Müller, a major dairy producer, faced challenges with an outdated refrigeration plant that lacked automation and manual data acquisition at its Aretsried facility. This made controlling production processes, managing energy consumption, and conducting cost comparisons difficult. To modernize this system, Müller turned to the vendor, ProLeiT, to implement its Plant iT process control system.

ProLeiT implemented its Plant iT system to create a consistent and integrated automation solution for the refrigeration and production areas. The solution enabled fully self-sustaining plant operation, complex control functions, and automatic acquisition of all relevant production and energy data. For Müller, this resulted in significantly increased efficiency and productivity, lower operating and maintenance costs, higher reliability, and greater transparency for optimizing the entire plant.


Open case study document...

ProLeiT

48 Case Studies