Project Insight
43 Case Studies
A Project Insight Case Study
Monolithic Power Systems (MPS), a manufacturer of power-management products for applications like back-lighting, automotive and chargers, was managing dozens of concurrent product introductions with spreadsheets. Growth made real-time tracking difficult and exposed gaps in cross-continent transparency, schedule notifications and timely document-approval workflows.
MPS implemented Project Insight to centralize project management with a web-based system that simplified document control, change management and resource allocation. The result: faster, more transparent collaboration across teams and locations, locked-in schedules and baselines, better time and resource tracking, real-time financials and actionable reporting to keep projects on schedule and costs controlled.