ProEst
35 Case Studies
A ProEst Case Study
Kolde Construction, a St. Marys, KS concrete contractor with 35–40 employees and over $4M in annual revenue, faced a need to streamline its estimating processes. To address that challenge they turned to ProEst, implementing ProEst Estimating Software to speed and standardize bid preparation.
ProEst integrated ProEst Estimating with ComputerEase accounting to allow imports in seconds and generate fast, accurate estimates, professional proposals and actionable reports. The result was a higher bid‑hit ratio, increased work volume and annual profits, better job scheduling and budget control, and greater confidence in the numbers produced thanks to ProEst.
Malcolm Smith
Estimating Lead