Case Study: Build in Amsterdam Gains Clarity and Control Over Projects with Productive

A Productive Case Study

Preview of the Build in Amsterdam Case Study

How Build in Amsterdam Gained Control Over Projects With Productive

Build in Amsterdam, a digital design agency, struggled with limited project management capabilities using Excel and a previous tool that couldn't scale with their growth. Their challenges included inefficient budget management, a manual and error-prone invoicing process, and a lack of control over time tracking for their increasing number of retainer clients.

By implementing Productive, the agency gained a scalable solution that provided crucial budget oversight and automated their invoicing through a direct connection to Exact. The platform's time approval features and Google Calendar integration brought clarity and control to project tracking. As a result, Build in Amsterdam significantly reduced errors, improved internal collaboration, and saved considerable time on their administrative processes.


View this case study…

Build in Amsterdam

Karla Vincheva

Head of Production


Productive

25 Case Studies