Timberlake Construction, a commercial general contractor, faced challenges with inefficient, outdated project management processes. Their teams were wasting significant time tracking down information, working from obsolete documents, and performing manual double entry, which led to rework and delays. They needed a modern solution to streamline operations and support their growth, which led them to the vendor Procore.
By implementing Procore's project management software, Timberlake Construction automated the tracking of vital project information like RFIs and submittals. This resulted in dramatically shorter turnaround times, a significant reduction in paper drawing sets and associated costs, and the elimination of manual data entry. Procore provided the solution that enabled the team to focus on managing the project instead of managing information.